Zone 9 South Improvements

Base Bid: The project consists of the construction of a new 1.5 million gallon welded steel reservoir with site grading and overflow basin, approximately 1,700 LF of 18” ductile iron waterline, and approximately 4,200 LF of 12” PVC waterline within District property and existing rights of way along Day Mt. Spokane and E. Lowe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents.

Status

Bidding Closed

Prebid Date6/16/20 2:00 pm

Bid Date7/2/20 10:00 am

Company & Contacts

Welch Comer Engineers

Necia Maiani nmaiani@welchcomer.com   Taylor Tompke ttompke@welchcomer.com 208-664-9382

Location

Mead, WA

Project Estimate: $3,000,000 to $4,000,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

With reference to Section 00 1113, the non-mandatory Onsite Pre-Bid Conference has been rescheduled for Tuesday June 16, 2020 at 2:00 p.m. A project overview presentation will be made available on or before Friday, June 12, 2020 for the Contractor’s review prior to the rescheduled Pre-Bid Conference.