Carlin Bay Water System Raw Water Intake
The project consists of the installation of a new lake water intake structure, two 20-hp submersible pumps, and approximately 375 LF of 6-inch HDPE waterline. The work will include approximately 100 LF of open trench pipe installation below the Coeur d’Alene Lake ordinary high-water mark and the remainder of the pipe will be placed on the lake floor. All work shall be in accordance with the contract documents and permitting requirements including, but not limited to, the Idaho Department of Lands Lake Encroachment Permit and Department of Army Corps. of Engineers permits included with these documents.
Status
Bidding Closed
Prebid Date1/6/21 10:00 am
Bid Date1/21/21 2:00 pm
Company & Contacts
Welch Comer Engineers
Steve Cordes or Derek Huff (208) 664-9382 scordes@welchcomer.com or dhuff@welchcomer.com
Location
Coeur d'Alene, ID
Project Estimate: $100,000 to $200,000
Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.
01-06-21 at 10am: A pre-bid walk through is scheduled at the project site on Wednesday January 6, 2021 at 10:00 am.