Whitworth Water District No. 2 - Mill Road Transmission Main Phase 1

The project consists of the construction of approximately 5,000 lineal feet of 24” ductile iron waterline within Mill Rd., Dartford Dr., and existing easements. All work shall be in accordance with the contract documents, including but not limited to the following: Base Bid – shall include installation of approximately 4,700 lineal feet of waterline in Mill Rd., Dartford Dr., and existing Easements. Add Alternate No. 1 Tie- In Option 1 – shall include installation of approximately 60 lineal feet of additional waterline installation in Mill Rd. Add Alternate No. 2 Tie- In Option 2 – shall include installation of approximately 260 lineal feet of shall include additional waterline installation in Mill Rd.
  Addendum #1 (click to expand/collapse)
Name Size
20190401 Addendum-1 4.7 MB
  Addendum #2 (click to expand/collapse)
Name Size
20190405 Addendum 2 455.4 KB
  Addendum #3 (click to expand/collapse)
Name Size
20190408 Addendum 3 20.8 KB