Coeur d'Alene Lake Dr Rehab and Overlay

This rehabilitation project is located on Coeur d’Alene Lake Drive and takes place between Silver Beach Road and Higgens Point. This project includes the milling of the existing road surface and full depth pavement repairs in select locations, concrete sidewalk and curb removals and replacements, a 2-inch asphalt pavement overlay, and striping.

Status

Bidding Closed

Prebid Date6/5/19 2:00 pm

Bid Date6/12/19 2:00 pm

Company & Contacts

Welch Comer Engineers

Matt Gillis, mgillis@welchcomer.com   (208) 664-9382

Location

Coeur d'Alene, ID

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A non-mandatory pre-bid walkthrough is scheduled for June 5, 2019 at 2:00 p.m. Interested parties shall meet at the East Side Highway District, 6095 E. Mullan Trail Road, Coeur d’Alene, Idaho 83814.