Howell Sewer Interceptor

The project consists of the construction of approximately 3,100 linear feet of 15-inch gravity sewer main installed at depths ranging from approximately 20 to 30 feet along McGuire Road and Poleline Avenue. The project includes a jack and bored casing and gravity main installation under the Union Pacific Railroad corridor, as well as gravity main installation within an existing casing under the Burlington Northern Santa Fe Railroad corridor. Following completion of the gravity main, the existing Howell Lift Station will be decommissioned. Additionally, the project includes the installation of approximately 200 linear feet of 6-inch, 8-inch, and 16-inch force mains under the Seltice Way corridor near Empire Center Boulevard. All work shall be in accordance with the contract documents.

Status

Bidding Closed

Bid Date7/23/19 1:00 pm

Company & Contacts

Welch Comer Engineers

Steve Cordes, scordes@welchcomer.com   (208) 664-9382

Location

Post Falls, ID

Project Estimate: $800,000.00 to $1,100,000.00

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

06/25 – A pre-bid meeting is scheduled at the City of Post Falls, Water Reclamation Facility Admin Building #2, located at 2002 W. Seltice Way, Post Falls, ID 83854 on June 25, 2019 at 2:00 p.m. with a site visit to follow.