Public Jobs

Bidding Closed
7/2/20 10:00 am
Zone 9 South Improvements
Welch Comer Engineers
Mead, WA
Base Bid: The project consists of the construction of a new 1.5 million gallon welded steel reservoir with site grading and overflow basin, approximately 1,700 LF of 18” ductile iron waterline, and approximately 4,200 LF of 12” PVC waterline within District property and existing rights of way along Day Mt. Spokane and E. Lowe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents.
Bidding Closed
6/2/20 2:00 pm
Buckeye Avenue Rehabilitation Project
Welch Comer Engineers
Millwood, WA
Improvement of Buckeye Avenue Full Rehabilitation Project, including excavation and haul, grinding asphalt, paving, pedestrian ramp, seeding, a storm system and other work.
Bidding Closed
5/21/20 2:00 pm
Main St. / Astor Ave. and Heritage Court Improvements
Welch Comer Engineers
Colville, WA
Concrete pavement, asphalt pavement, landscaping, irrigation, site electrical, storm sewer installation, sidewalks, concrete crosswalks, RRFB installation, and other work.
Bidding Closed
4/30/20 2:00 pm
Seventh Street Pedestrian Improvements, University of Idaho
Welch Comer Engineers
Moscow, ID
A description of the work of this project can be summarized to include a raised concrete intersection, sidewalks, brick pavers, colored concrete, lighting, covered structures, site furnishings, landscaping and irrigation.
Bidding Closed
2/25/20 2:00 pm
Kootenai County Fairgrounds RV Park Phase 3
Welch Comer Engineers
Coeur d'Alene, ID
The BASE BID A SCOPE of the project generally includes trenching and utility installation to an Owner installed pre-manufactured showerhouse, site grading, parking lot asphalt, concrete sidewalk, and related facilities shown in the Construction Documents. The BASE BID B SCOPE generally includes abandonment of the Kootenai County Compton Building sewer drainfield and connection to the City of Coeur d’Alene Sewer System.
Bidding Closed
12/12/19 2:00 pm
3D Well Building and Piping
Welch Comer Engineers
Spokane, WA
The project consists of the construction of a well building, site piping, and site work as described in the plans. Pump supplier/installer to be prequalified by the District prior to bid. Bidder must list the pump supplier/installer as a subcontractor in the bid documents. All work shall be in accordance with the contract documents.
Bidding Closed
11/7/19 10:00 am
Railroad Street Preservation Project
Welch Comer Engineers
Colville, WA
Improvement of Railroad Street Preservation Project, including sidewalk and curb ramp improvements, full depth pavement repairs, planning of the existing bituminous pavement, a 2” HMA overlay, and other work.
Bidding Closed
8/6/19 2:00 pm
Kootenai County Administration and Elections Parking Lots
Welch Comer Engineers
Coeur d'Alene, ID
The SCOPE of the project generally includes site demolition, grading, parking lot asphalt, curbing, sidewalks, irrigation and landscaping and related facilities shown in the Construction Documents.
Bidding Closed
7/9/19 10:00 am
Mill Road Transmission Main Phase 2
Welch Comer Engineers
Spokane, WA
The project consists of the construction of approximately 4,500 lineal feet of 24” ductile iron waterline within existing easements from Mill Road to Farwell Road and within the rights of way 5106 of Farwell Road, Mayfair Road and Hastings Road. Work also includes construction of approximately 200 lineal feet of 12” ductile iron waterline within the Farwell Road right of way. Surface restoration includes both asphalt and dryland hydroseed restoration. All work shall be in accordance with the contract documents.
Bidding Closed
7/23/19 1:00 pm
Howell Sewer Interceptor
Welch Comer Engineers
Post Falls, ID
The project consists of the construction of approximately 3,100 linear feet of 15-inch gravity sewer main installed at depths ranging from approximately 20 to 30 feet along McGuire Road and Poleline Avenue. The project includes a jack and bored casing and gravity main installation under the Union Pacific Railroad corridor, as well as gravity main installation within an existing casing under the Burlington Northern Santa Fe Railroad corridor. Following completion of the gravity main, the existing Howell Lift Station will be decommissioned. Additionally, the project includes the installation of approximately 200 linear feet of 6-inch, 8-inch, and 16-inch force mains under the Seltice Way corridor near Empire Center Boulevard. All work shall be in accordance with the contract documents.