Public Jobs

Bids due in 19 days
2/7/19 10:00 am
SR 395 Railroad to Buena Vista Sidewalk Project (Re-Bid)
Welch Comer Engineers
Colville, WA
Improvement of SR 395 Railroad to Buena Vista Sidewalk Project Re-Bid, including a sidewalk, curb, approaches, and other work, all in accordance with the Contract Plans, Contract Provisions, and Standard Specifications.
Bids due in 19 days
2/7/19 2:00 pm
WSA 1-2 Intertie Project
Welch Comer Engineers
Spokane Valley, WA
Installation of approximately 11,500 linear feet of 24-inch ductile iron waterline and approximately 5,200 linear feet of 18 inch ductile iron waterline for Spokane County Water District no. 3 (SCWD #3). The line runs along Cataldo from Vista to Marguerite, along Margeurite from Cataldo to Valleyway, along Valleyway from Marguerite to Willow, along Willow from Valleyway to 1st, along 1st from Willow to Farr, along Farr from 1st to 8th, along 8th from Farr to Woodruff, along Woodruff from 8th to 15th, along 15th from Woodruff to Oberlin and along Oberline from 15th to 16th. No services or hydrants will be installed. Also includes installation of a PRV station and vault at Cataldo and Vista. Add Alternate No. 1: Includes milling and 2” overlay on Valleyway from Margurite to Mullan and on Farr from Appleway to 8th. Also includes an overlay of Woodruff from 9th to 10th. Includes full depth pavement repair in identified locations within the project limits.
Bids due in 10 days
1/29/19 2:00 pm
Twin Lakes Water System Tree Farm Well House
Welch Comer Engineers
Twin Lakes, Northern ID
The project consists of the construction of concrete masonry unit (CMU) building, supply and installation of mechanical piping at the Tree Farm Well Site. Also includes associated electrical work at the Well Site.
Bids due in 19 days
2/7/19 2:00 pm
Ramsey Well
Welch Comer Engineers
Hayden, Northern ID
The project consists of the drilling and development of a new 24-inch production well by means of Dual Rotary for the Avondale Irrigation District with a target depth of 400 feet. Work will include 30-inch surface seal and setting a temporary pump to test pumping the well. All work shall be in accordance with the contract documents.
Bidding Closed
1/9/19 2:00 pm
Silke Booster Improvements (Re-Bid)
Welch Comer Engineers
Colville, Eastern WA
The project consists of the installation of the replacement of three (3) existing booster pumps with one (1) new 60 HP pumps and (2) new 30 HP pumps. Includes associated mechanical piping and electrical equipment within an existing building. All work shall be in accordance with the contract documents.
Bidding Closed
11/28/18 2:00 pm
Whitworth Water District No. 2 Well 3D Drilling
Welch Comer Engineers
Spokane, Eastern WA
The project consists of the drilling and development of a new 22-inch production well by means of Dual Rotary or cable tool for Whitworth Water District No. 2 with a target depth of 455 feet. Work will include 30-inch surface seal and setting a temporary pump to test pump the well.
Bidding Closed
9/27/18 2:00 pm
Lancaster Transmission Main 2018 Project
Welch Comer Engineers
Hayden, Northern ID
Construction of approximately 2717 lineal feet of 16" PVC water main, valves, and appurtenances. All pipe and fittings will be provided as Owner-Furnished Equipment.