Public Jobs

Bids due in 9 days
4/4/19 2:00 pm
Whitworth Water District No. 2 - Mill Road Transmission Main Phase 1
Welch Comer Engineers
Spokane, WA
The project consists of the construction of approximately 5,000 lineal feet of 24” ductile iron waterline within Mill Rd., Dartford Dr., and existing easements. All work shall be in accordance with the contract documents, including but not limited to the following: Base Bid – shall include installation of approximately 4,700 lineal feet of waterline in Mill Rd., Dartford Dr., and existing Easements. Add Alternate No. 1 Tie- In Option 1 – shall include installation of approximately 60 lineal feet of additional waterline installation in Mill Rd. Add Alternate No. 2 Tie- In Option 2 – shall include installation of approximately 260 lineal feet of shall include additional waterline installation in Mill Rd.
Bids due in 9 days
4/4/19 2:00 pm
Priest River Downtown Revitalization
Welch Comer Engineers
Priest River, ID
Base Bid: Includes roadway reconstruction, curb, sidewalk, landscaping, irrigation and illumination on Main Street and High Street. A new water main will be installed on Main Street with new hydrants, meters and services. The project will also include trench, backfill, conduit and vault installation for Frontier utility burial on High Street. Add Alt 1 – North Main Street: Includes roadway reconstruction, curb, sidewalk, landscaping, irrigation and illumination on Main Street between Base Bid Limits and US 2. A new water main will be installed on Main Street with new hydrants, meters and services. Add Alt 2 – South Main Street: Includes roadway reconstruction, curb, sidewalk, landscaping, irrigation and illumination on Main Street between Montgomery Street and Base Bid Limits. A new water main will be installed on Main Street with new hydrants, meters and services.
Bidding Closed
3/7/19 2:00 pm
WSA 1-2 Intertie Project (Re-Bid)
Welch Comer Engineers
Spokane Valley, WA
Base Bid: Installation of approximately 11,500 linear feet of 24-inch ductile iron waterline and approximately 5,200 linear feet of 18-inch ductile iron waterline for Spokane County Water District no. 3 (SCWD #3). The line runs along Cataldo from Vista to Marguerite, along Marguerite from Cataldo to Valleyway, along Valleyway from Marguerite to Willow, along Willow from Valleyway to 1st, along 1st from Willow to Farr, along Farr from 1st to 8th, along 8th from Farr to Woodruff, along Woodruff from 8th to 15th, along 15th from Woodruff to Oberlin and along Oberline from 15th to 16th. No services or hydrants will be installed. Also includes installation of a PRV station and vault at Cataldo and Vista. Add Alternate No. 1: Includes milling and 1.5” overlay on Valleyway from Marguerite to Mullan and on Farr from Appleway to 8th. Also includes an overlay of Woodruff from 9th to 10th. Includes full depth pavement repair in identified locations within the project limits.
Bidding Closed
2/7/19 10:00 am
SR 395 Railroad to Buena Vista Sidewalk Project (Re-Bid)
Welch Comer Engineers
Colville, WA
Improvement of SR 395 Railroad to Buena Vista Sidewalk Project Re-Bid, including a sidewalk, curb, approaches, and other work, all in accordance with the Contract Plans, Contract Provisions, and Standard Specifications.
Bidding Closed
2/7/19 2:00 pm
Ramsey Well
Welch Comer Engineers
Hayden, Northern ID
The project consists of the drilling and development of a new 24-inch production well by means of Dual Rotary for the Avondale Irrigation District with a target depth of 400 feet. Work will include 30-inch surface seal and setting a temporary pump to test pumping the well. All work shall be in accordance with the contract documents.