Kootenai County Administration and Elections Parking Lots
Welch Comer Engineers
Coeur d'Alene, ID
The SCOPE of the project generally includes site demolition, grading, parking lot asphalt, curbing, sidewalks, irrigation and landscaping and related facilities shown in the Construction Documents.
Bidding Closed
7/9/19 10:00 am
Mill Road Transmission Main Phase 2
Welch Comer Engineers
Spokane, WA
The project consists of the construction of approximately 4,500 lineal feet of 24” ductile iron waterline within existing easements from Mill Road to Farwell Road and within the rights of way 5106 of Farwell Road, Mayfair Road and Hastings Road. Work also includes construction of approximately 200 lineal feet of 12” ductile iron waterline within the Farwell Road right of way. Surface restoration includes both asphalt and dryland hydroseed restoration. All work shall be in accordance with the contract documents.
Bidding Closed
7/23/19 1:00 pm
Howell Sewer Interceptor
Welch Comer Engineers
Post Falls, ID
The project consists of the construction of approximately 3,100 linear feet of 15-inch gravity sewer main installed at depths ranging from approximately 20 to 30 feet along McGuire Road and Poleline Avenue. The project includes a jack and bored casing and gravity main installation under the Union Pacific Railroad corridor, as well as gravity main installation within an existing casing under the Burlington Northern Santa Fe Railroad corridor. Following completion of the gravity main, the existing Howell Lift Station will be decommissioned. Additionally, the project includes the installation of approximately 200 linear feet of 6-inch, 8-inch, and 16-inch force mains under the Seltice Way corridor near Empire Center Boulevard. All work shall be in accordance with the contract documents.
Bidding Closed
6/12/19 2:00 pm
Coeur d'Alene Lake Dr Rehab and Overlay
Welch Comer Engineers
Coeur d'Alene, ID
This rehabilitation project is located on Coeur d’Alene Lake Drive and takes place between Silver Beach Road and Higgens Point. This project includes the milling of the existing road surface and full depth pavement repairs in select locations, concrete sidewalk and curb removals and replacements, a 2-inch asphalt pavement overlay, and striping.
Bidding Closed
6/13/19 2:00 pm
Ramsey Well House
Welch Comer Engineers
Hayden, ID
Work will include the construction of a new stick frame wellhouse structure, interior and exterior piping, discharge structures, and site work. Well pump, motor, controls, telemetry, landscaping, and all electrical work will be by others.
Bidding Closed
5/13/19 2:00 pm
Idaho St. to Bay St. Ped Access
Welch Comer Engineers
Post Falls, ID
The project consists of constructing 2000 feet of sidewalk. All work shall be in accordance with the contract documents, including but not limited to the following: constructing sidewalks and pedestrian ramps along the north side of Seltice Way between Idaho Street and Bay
Bidding Closed
4/11/19 2:00 pm
Colville Evergreen Way Waterline
Welch Comer Engineers
Colville, WA
The project consists of construction of approximately 2,100 lineal feet of 16-inch C900
Bidding Closed
4/9/19 2:00 pm
Whitworth Water District No. 2 - Mill Road Transmission Main Phase 1
Welch Comer Engineers
Spokane, WA
The project consists of the construction of approximately 5,000 lineal feet of 24” ductile iron waterline within Mill Rd., Dartford Dr., and existing easements. All work shall be in accordance with the contract documents, including but not limited to the following: Base Bid – shall include installation of approximately 4,700 lineal feet of waterline in Mill Rd., Dartford Dr., and existing Easements. Add Alternate No. 1 Tie- In Option 1 – shall include installation of approximately 60 lineal feet of additional waterline installation in Mill Rd. Add Alternate No. 2 Tie- In Option 2 – shall include installation of approximately 260 lineal feet of shall include additional waterline installation in Mill Rd.
Bidding Closed
4/4/19 2:00 pm
Priest River Downtown Revitalization
Welch Comer Engineers
Priest River, ID
Base Bid: Includes roadway reconstruction, curb, sidewalk, landscaping, irrigation and illumination on Main Street and High Street. A new water main will be installed on Main Street with new hydrants, meters and services. The project will also include trench, backfill, conduit and vault installation for Frontier utility burial on High Street. Add Alt 1 – North Main Street: Includes roadway reconstruction, curb, sidewalk, landscaping, irrigation and illumination on Main Street between Base Bid Limits and US 2. A new water main will be installed on Main Street with new hydrants, meters and services. Add Alt 2 – South Main Street: Includes roadway reconstruction, curb, sidewalk, landscaping, irrigation and illumination on Main Street between Montgomery Street and Base Bid Limits. A new water main will be installed on Main Street with new hydrants, meters and services.
Bidding Closed
3/7/19 2:00 pm
WSA 1-2 Intertie Project (Re-Bid)
Welch Comer Engineers
Spokane Valley, WA
Base Bid: Installation of approximately 11,500 linear feet of 24-inch ductile iron waterline and approximately 5,200 linear feet of 18-inch ductile iron waterline for Spokane County Water District no. 3 (SCWD #3). The line runs along Cataldo from Vista to Marguerite, along Marguerite from Cataldo to Valleyway, along Valleyway from Marguerite to Willow, along Willow from Valleyway to 1st, along 1st from Willow to Farr, along Farr from 1st to 8th, along 8th from Farr to Woodruff, along Woodruff from 8th to 15th, along 15th from Woodruff to Oberlin and along Oberline from 15th to 16th. No services or hydrants will be installed. Also includes installation of a PRV station and vault at Cataldo and Vista. Add Alternate No. 1: Includes milling and 1.5” overlay on Valleyway from Marguerite to Mullan and on Farr from Appleway to 8th. Also includes an overlay of Woodruff from 9th to 10th. Includes full depth pavement repair in identified locations within the project limits.